Siemens transformer recycling company
now about Siemens transformer recycling company_ There are many discussions about innovation transcendence. Today, this article also analyzes it for you! The distribution cabinet should be cleaned and maintained on time, so that Siemens transformer can be recycled and the equipment can always be in good working condition. 8、 When the generator works and the marine engineer operates the distribution board, he should concentrate on his thoughts and operate carefully to prevent accidents, otherwise he will be investigated for personal accidents. 9、 The charging and discharging board is the ship's emergency distribution board. The engineer on duty should often check its working condition, ensure that the low-voltage power is sufficient at any time, and master the working condition of the magnetic saturation regulator through the instrument on the board. On the basis of many years of application experience of domestic and foreign counterparts in the distribution microcomputer protection device, combined with the actual characteristics of the domestic Siemens transformer recovery integrated automation system, the belt silicon steel sheet of the
ring power transformer, which integrates guard, monitoring, control, communication and other functions, if the splicing process is selected, does it reflect that the quality is definitely not good? It can't be confused, but it's not easy for Siemens transformer to recover and splice too many broken ends, because one more broken position will add one magnetic leakage point, so the number of joint points should not exceed 2-3. In terms of manufacturing process, all broken ends and splices must be pickled first, but the ring transformer for manufacturing high-end audio equipment is strictly speaking, the silicon steel sheet without splicing is used, and its process quality will be more guaranteed. Detection of Zhongzhou power transformer: A. turn the multimeter to R × In gear 1, check the on-off status of each winding one by one according to the pin arrangement law of each winding of Siemens transformer recovery mid cycle transformer, and then determine whether it is normal. b. Test the insulation property: put the multimeter in R × 10K gear, do the following state tests: (1) resistance value between primary winding and secondary winding; (2) Resistance value between primary winding and shell
the transformer is composed of an iron core (or magnetic core) and a coil. The coil has two or more windings, of which the winding connected to the power supply is called the primary coil, Siemens transformer recovery, and the other windings are called the secondary coil. It can change AC voltage, current and impedance. The core transformer is composed of a core made of soft magnetic material and two coils with different turns sleeved on the core, as shown in the figure. The transformer is a device that uses the principle of electromagnetic induction to change the AC voltage. The main components are Siemens transformer to recover the primary coil, secondary coil and iron core (magnetic core). The main functions are: voltage transformation, current transformation, impedance transformation, isolation, voltage stabilization (magnetic saturation transformer), etc. According to the purpose, it can be divided into: power transformer and special transformer (electric furnace transformer, rectifier transformer, power frequency test transformer, voltage regulator, mining transformer, audio transformer, intermediate frequency transformer, high frequency transformer, impulse transformer, instrument transformer, electronic transformer, reactor, mutual inductor, etc.). Circuit symbols often begin with T Example: T01, t201, etc
Siemens transformer recycling_ Innovation surpasses, and the air insulation gap is small. For a long time, some high-voltage switchgear manufacturers have not seriously implemented the relational technical standards, so that at this moment, Siemens transformer recovers some operating 10kV high-voltage switchgear cabinets, and the air insulation gap between the charged body in the cabinet is mostly 100 ~ 125mm. As electrical equipment with pure air insulation, the technical specification for assembly design of high voltage distribution clearly stipulates that the minimum clearance of pure air insulation of 10kV system is 125mm. It can be seen from the results of AC voltage withstand test and the explanation of the possible experimental items in combination with the accident that the phase of the charged body in the 10kV high-voltage switchgear cabinet is changed into metal and glass, which can attract more attention. The minimum air insulation gap between the phase and the phase, and between the phase and the ground is less than 125mm, and the capacity accident occurs. 1.2 the insulation nature of supporting accessories is poor. There are a large number of manufacturers of 10kV high-voltage switchgear in China. In order to reduce the cost, some manufacturers adopt supporting accessories with low insulation level, resulting in the decline of the pollution flashover voltage of the whole switchgear, which cannot meet the requirements of the rated standard. According to the "selection principle of 6 ~ 10kV High Voltage Switchgear" and the actual operation experience, the author believes that the specific creepage distance of surface insulation of accessories equipped with 10kV High Voltage Switchgear should not be lower than the following requirements: ceramic insulation 18mm/kv, organic insulation 20mm/kv
maintenance of substation cabinet: 1: before operation, the following steps should be followed: disconnect the burden on the low-voltage side one by one, disconnect the circuit breaker on the high-voltage side, close the grounding switch, lock the high-voltage switchgear, hang the sign board of "resistance to closing, someone works" on the handle of the switchgear, and then short-circuit the busbar with more than 10mm2 wires and hang the grounding wire, tighten the busbar screws (3) pour concrete with strength grade not less than C20 in the pit. 2: Maintenance operation steps: wipe the contact of busbar again, apply Siemens transformer recovered power compound grease, tighten it with new spring gasket screws, check whether there is any abnormality in the insulator and spacing connection between busbar, and check the authenticity of the connection of secondary winding terminal of current, voltage and transformer. 3: Inspection and test before power transmission: abolish all grounding wires and short wires, check whether there are tools left at the work site, and after confirmation, close the remote switch, disconnect the grounding switch at the high voltage side, close the circuit breaker at the high voltage side of the operating transformer, remove the signboard, send power to the transformer, then close the circuit breaker at the low voltage side of the power receiving cabinet, send power to the busbar, and finally close the automatic air switch of the connecting cabinet and each branch
LINK
Copyright © 2011 JIN SHI